Taunton Fabrications were appointed by VINCI Construction to complete all of the secondary and architectural metalwork at Pro Cathedral in Bristol.
VINCI Construction UK was appointed by Student Castle Ltd to undertake the development of the former Bristol Pro Cathedral site into high end new student accommodation.
The project featured 229 student units and involved the construction of a new building comprising of a large concrete frame and the part refurbishment of the existing Grade II* listed Cathedral, with a structured steel frame erected internally.
Taunton Fabrications were appointed by VINCI Construction to complete all of the secondary and architectural metalwork including the impressive atrium stairs, structural glass balustrade and timber handrails as well as the feature external window grills.