Project details:
Contractor:
LEADBETTER CONSTRUCTION
Architects:
ALEC FRENCH
Architectural elements:
STRUCTURAL STEELWORK & TIMBER BALUSTRADE
About the project:
Taunton Fabrications was awarded the complete metalwork package to include the structural, architectural and timber elements of the Aardman Animations project.
With the client clearly having a design interest, attention to detail was paramount. The galvanized structural steelwork was displayed as a feature of the design and by incorporating our timber balustrade over two floors, it gave the atrium a very light and open feel.







