Project details:
Contractor:
Bouygues UK
Architects:
Powell Dobson
Architectural elements:
Feature Stairs and Atrium Balustrading
About the project:
Taunton Fabrications was appointed to design, manufacture and install the striking feature stair and balustrading in the central atrium, providing a focal point for the building and supporting the flow of people through the space. Working closely with the design and construction teams, we ensured our detailing and finishes reflected the project’s high architectural standards while meeting demanding programme requirements.
The installation of the balustrade panels, each weighing around 240kg, was delivered in a carefully planned two-phase process. We began by fitting the first-fix brackets, creating a safe and coordinated environment for other trades to continue their work. Once the site was ready, our team returned to install the heavy balustrade panels, using a spider crane to ensure precise placement and safe handling
The project placed strong emphasis on sustainability and social value, with net-zero site emissions achieved during construction and over £35 million in community benefit delivered. Our contribution formed part of a collaborative effort to create a high-quality, multi-functional facility that is both visually impressive and practical for its wide range of users.
Handover of Canolfan Pentre Awel took place in September 2025, with the facility opening to the public the following month. It now stands as a showcase for sustainable design, community investment and innovative construction in Wales.
Images used © Bouygues UK
“Delivering the atrium stair and balustrading was a real team effort. With such a busy site, the logistics and planning had to be spot on and Bouygues worked closely with us to make sure everything was coordinated smoothly. That level of collaboration meant we could focus on quality and finish and the end result really speaks for itself.”
Dave Baverstock, Contracts Director, Taunton Fabrications