Project details:

Contractor:

Halsall

Architects:

Roberts Limbrick

Architectural elements:

Feature Stairs, Atrium Balustrading and Handrails

About the project:

Taunton Fabrications was appointed to design, manufacture and install the feature stair and balustrading in the central atrium as well as external balustrading. The feature stair provides a focal point for the building and supporting the flow of people through the space. Working closely with the design and construction teams, we ensured our detailing and finishes reflected the project’s high architectural standards while meeting demanding programme requirements.

The University Learning Hub combined a purpose-built extension with the refurbishment of the existing library, creating a modern 3,048m² two-storey facility accessible to students 24 hours a day, 365 days a year. The ground floor was designed as a flexible, open-plan space to support collaboration, incorporating a café and self-service kitchen. It also provided access to key student support services, including the Innovation, Careers and Enterprise (ICE) team, Academic Registry, and Student Services. The first floor was dedicated to focused learning, housing the library, quiet study areas, and modern teaching rooms. The building was designed with sustainability in mind, targeting a BREEAM ‘Excellent’ rating. Features such as green roofing and enhanced landscaping support local biodiversity, ensuring the development is environmentally responsible as well as student-focused.

Given the nature of the building, particularly the open-plan ground floor and prominent atrium space, the architectural steelwork played a key role in both function and appearance. The feature stairs and atrium balustrading were highly visible elements within the finished building, requiring careful attention to alignment, finish, and interface with surrounding materials.

To support the overall project objectives:

  • Significant elements were pre-assembled in our factory to improve quality and consistency
  • Coordination with other trades was prioritised to ensure clean interfaces within the atrium and internal spaces
  • Installation was planned to align with programme constraints and minimise disruption within the live site environment

The use of pre-assembly and controlled manufacturing contributed to efficient installation and reduced on-site issues. The project was completed successfully, with all steelwork installed in line with programme and quality expectations.