Project details:

Contractor:

Sir Robert McAlpine

Architects:

Gensler

Architectural elements:

Feature Stair, Stair Packages, Balustrading, Gates, Screens, External Metalwork and Wind Baffles.

About the project:

Delivered by Sir Robert McAlpine, the 17-storey fully glazed tower provides high-quality office and flexible workspace, ground floor retail, basement parking and improved public realm, including a new public square and link bridge creating level access between the station and the town centre.

Taunton Fabrications was appointed by Sir Robert McAlpine to deliver a wide-ranging architectural metalwork package for the project, with the feature atrium stair forming one of the most prominent and technically detailed elements of our works.

Our package covered a broad range of internal and external metalwork across the development, supporting the building’s access, circulation, safety and public realm requirements.This included stair packages, balustrading, car park metalwork, mesh gates and screens, edge protection, external steps, wall-top balustrading and wind baffles.

Feature Atrium Stair

The feature stair was designed as a prominent internal centrepiece, combining painted structural steelwork, laminated glass balustrading, integrated handrail details and timber treads. Located within the atrium, the stair needed to provide a high-quality architectural finish while meeting the structural and practical requirements of a busy commercial building. Its position within the main internal space meant that detailing, alignment, finish and coordination were all critical.

The stair structure was finished powder coated in RAL 7021, creating a clean, dark architectural line through the atrium. This was complemented by laminated glass balustrading and ash timber treads supplied by our trusted sub-contractor Thomas Brothers Joinery complete with non-slip inserts.

The stair had to interface with finished floor levels, slab edges, landings, glass lines, handrails, lighting provisions, timber treads and surrounding atrium finishes. These details had to be developed and managed carefully to ensure the stair worked both technically and visually. Taunton Fabrications worked through the design and fabrication details to ensure the completed stair could be manufactured accurately, installed safely and integrated successfully within the wider building.

Images used © Houston Cox

Working with Sir Robert McAlpine on One Station Hill was a great opportunity for Taunton Fabrications to support a major commercial development with a broad architectural metalwork package. We have built a strong working relationship with Sir Robert McAlpine over a number of projects, based on trust, communication and delivering what we say we will. One Station Hill is a good example of that relationship in action, with our team supporting the wider scheme while also delivering a high-quality feature stair that forms a key part of the building’s atrium space.Projects of this scale rely on good coordination from the outset, and we are proud to have played our part in delivering such a prominent scheme in the heart of Reading.

Chris Sampson, Commercial Director

Project gallery: