Project details:
Contractor:
Willmott Dixon
Architects:
ADP Architecture
Architectural elements:
Timberclad Feature Stairs and Atrium Balustrading, External Stairs and Roof Hop Overs
About the project:
Willmott Dixon delivered two new state-of-the-art buildings at Oxford Brookes University’s Headington Hill campus, creating new teaching, workshop and collaboration spaces for STEM, creative and technology-based learning.
The development includes a three-storey Teaching Building with robotics labs, 3D printing facilities, graphic design studios, exhibition space, a digital theatre, VR Cave, central atrium and café. A separate Workshop Building provides industry-standard technical facilities and hands-on teaching spaces designed to reflect real-world working environments. The project was delivered with ADP Architecture and is intended to support teaching, research, employability and collaboration between students, staff, industry partners and the wider community.
The package delivered by Taunton Fabrications included a prominent timber-clad feature staircase, external staircase, atrium balustrading and roof hop overs. Together, these elements supported both the visual quality and practical functionality of the building, combining architectural detailing with safe access and long-term durability.
Design and coordination
The feature staircase formed a key architectural element within the building and required careful coordination between the structural steelwork, timber cladding and surrounding finishes. Alongside this, the atrium balustrading and external access elements had to be coordinated with the wider construction programme, floor interfaces, roof areas and site access requirements.
Our design team worked closely with Willmott Dixon and the wider project team to develop the details, resolve interfaces and support a smooth transition from design through to manufacture and installation.
Fabrication and installation
As always, all steelwork was fabricated in-house at our Taunton facility, allowing us to maintain control over quality, sequencing and consistency across the different elements of the package. The feature stair required particular attention to accuracy and buildability, ensuring the steel structure provided the right foundation for the timber cladding and final architectural finish.
On site, our contracts and installation teams coordinated closely with Willmott Dixon to manage delivery, access, installation sequencing and final alignment across the stair, balustrading and roof access elements.
Finished result
The completed package demonstrates Taunton Fabrications’ ability to deliver architectural metalwork that combines visual impact, practical access and robust detailing. From the timber-clad feature staircase through to the atrium balustrading, external stairs and roof hop overs, the Oxford Brookes University project is a strong example of how early coordination, in-house fabrication and careful installation help deliver a high-quality result. This was a great project to be involved with and one that continues our strong working relationship with Willmott Dixon.
Images used © Willmott Dixon
It has been a privilege to work alongside Oxford Brookes University to bring their ambitious vision to life. These exceptional new buildings are not only architecturally striking but are also packed with advanced technologies and innovative learning spaces that will serve students, staff, and industry partners for years to come. We’re proud to have delivered facilities that will help shape the future of education and research, and which reflect the University’s clear commitment to excellence, sustainability, and community impact.
Richard Poulter, Managing Director of Willmott Dixon Construction South









