Project details:

Contractor:

BALFOUR BEATTY

Architects:

ARCHIAL

Architectural elements:

VARIOUSVARIOUS GLASS, STAINLESS STEEL BALUSTRADE, INTERNAL STAIRS & BOH STAIRS

About the project:

Plymouth Life Centre is one of the South West’s leading sport and leisure facilities, bringing together swimming, diving, indoor sports, fitness and bowls within a major public venue.

Taunton Fabrications was appointed to deliver a package valued at approximately £500,000, covering a broad range of specialist metalwork throughout the building. Our scope included stainless steelwork to the swimming pool and diving areas, sports halls and bowls facilities, together with the manufacture and installation of the main internal staircases, secondary stairs and associated architectural and structural metalwork.

The project was a strong demonstration of the breadth of work Taunton Fabrications can deliver within a single package, from structural steel and staircases through to high-specification stainless steel fabrication and finishing.

Leisure centres, and particularly swimming pool environments, place very specific demands on metalwork. High humidity, chlorinated atmospheres, frequent cleaning and constant public use all increase the importance of correct material selection, fabrication quality and surface finish.

For the Plymouth Life Centre, our experience in stainless steel fabrication was therefore critical. Components had to be manufactured and finished to a consistently high standard, with particular attention given to weld quality, surface preparation, cleanliness and corrosion resistance.Our dedicated stainless steel fabrication facility, together with experienced stainless steel fabricators and finishers, allowed this work to be carried out in a controlled environment and helped ensure the required level of finish was maintained throughout the package.

Quality, Compliance and Long-Term Performance

Public leisure facilities are heavily used environments, so durability, safety and consistency are essential.

Our fabrication processes were carried out in line with Taunton Fabrications’ established quality management procedures, with structural steelwork controlled in accordance with the requirements of BS EN 1090 where applicable and supported by our wider ISO 9001 quality management system.

Careful control of materials, welding, fabrication, inspection and finishing helped ensure that the installed metalwork met both the technical requirements of the project and the visual standards expected within a high-profile public building.

For stainless steelwork in particular, maintaining good fabrication and finishing practice is essential to preserving corrosion resistance and long-term appearance. This was especially important within the pool and diving areas, where the metalwork is exposed to one of the most demanding internal environments found in a public building.

Project gallery: