Project details:

Contractor:

Kier

Architects:

Whittam Cox Architects

Architectural elements:

Green Wall Support Structure, Plant Screen Steelwork, Balustrading, Structural Steel, Handrails and Gates

About the project:

The project required the delivery of multiple stair cores, plant screen structures, balustrades, handrails, gates and specialist steelwork elements across both Plot 2 and Plot 4 of the development.

One of the most distinctive aspects of our package was the steel support structure for the car park living wall, which would ultimately become the South West’s largest living wall and a defining feature of the completed scheme.

The Forum’s living wall presented a unique engineering challenge. Unlike conventional architectural metalwork, the support structure had to provide a robust framework capable of carrying the loading from the living wall system whilst maintaining the precise tolerances required for installation of the planting panels and irrigation components.

Working closely with the project team, Taunton Fabrications developed, detailed and manufactured a galvanised steel support system comprising hundreds of bespoke support posts and associated structural members designed to support the extensive vertical planting installation across 6 floors of car park. The structure was subject to detailed engineering assessment, including wind loading analysis, connection design and structural verification to ensure long-term performance and durability within an exposed external environment.

Once complete, the living wall became a landmark feature of the development, improving biodiversity, contributing to air quality improvements and helping to create a more sustainable urban environment.

The Forum development required extensive coordination across multiple interfaces, disciplines and building areas.

Our in-house design team developed fabrication details and installation solutions for a wide range of structural and architectural steelwork packages, ensuring compatibility with surrounding construction, building services, façade elements and architectural finishes.

Particular attention was required for the plant screen structures, terrace balustrading and staircore elements, where dimensional accuracy and installation sequencing were critical to maintaining programme requirements. All steelwork was manufactured within our Somerset facility under our EN 1090 Factory Production Control system before being delivered to site in a controlled sequence.

The project demonstrated our ability to deliver both structural and architectural metalwork packages simultaneously, combining engineering expertise with high-quality fabrication and installation.

The Forum demonstrated Taunton Fabrications’ capability to successfully deliver a diverse range of structural and architectural metalwork packages on a major city-centre development. From stair cores and plant screen steelwork to terrace balustrades and the support structure for the South West’s largest living wall, the project showcased our expertise in design, manufacture and installation across complex, multi-disciplinary projects.