Project details:

Contractor:

Sir Robert McAlpine

Architects:

Fielden Clegg Bradley Studios

Architectural elements:

Feature Stairs, balustrading, various miscellaneous secondary metalwork

About the project:

Few projects have become as instantly recognisable as the statement yellow staircase at the University of Bristol’s new Temple Quarter Enterprise Campus.

Now forming one of the defining features of the completed Sloane Robinson Building, the staircase rises through the main atrium as both a means of circulation and a significantly major architectural element. Its bold geometry and distinctive yellow finish have made it one of the most photographed parts of the building. Behind the finished appearance, however, was a substantial package of engineering, design, fabrication and site coordination.

The Sloane Robinson Building is the centrepiece of the University’s £500 million Temple Quarter Enterprise Campus. The 38,000m² building has been created on the former Royal Mail sorting office site beside Bristol Temple Meads and provides space for around 4,500 students and 650 staff. Sir Robert McAlpine completed the building on time and within budget ahead of its opening in September 2026.

Project video:

The Full Package

While the feature yellow staircases have undoubtedly become the most recognisable element of Taunton Fabrications’ work at the Temple Quarter Enterprise Campus, our involvement extended considerably beyond the main atrium.

Across the wider project, we supplied a substantial package of architectural and secondary metalwork. The package supports both the public-facing areas of the building and the access requirements needed for its ongoing operation and maintenance. This included additional internal staircases, glass balustrades and handrails, together with external stair and balustrade assemblies and other architectural metalwork elements. Across these elements, the fabrication drawings consistently specified work to Execution Class 2, with fabrication tolerances controlled to within 2mm.

Our secondary steelwork package also included a range of roof and maintenance access solutions, including:

  • roof hop-overs and access steps
  • fixed access ladders
  • roof-level stair assemblies
  • guardrails and handrails
  • access platforms and associated support steelwork
  • external balustrades and edge-protection elements

These parts of the project may attract less attention than the yellow staircases, but they required the same consideration of safe access, structural performance, durability, coordination with surrounding services and accurate fabrication. The rooftop elements also had to integrate closely with plant, solar arrays, cable routes and other building-services infrastructure, making coordination particularly important.

The wider package demonstrates the breadth of Taunton Fabrications’ involvement at TQEC: from highly finished architectural steelwork in the building’s main public spaces through to the practical access steelwork required to keep a major university building safely maintainable throughout its working life.

Designed for Manufacture

A key challenge was ensuring the feature staircases could be manufactured, transported, lifted and installed as successfully as they had been designed.

For Atrium 1, the supporting wall structure was fabricated in two sections to suit the lifting capacity available on site. Atrium 2 followed a similar approach, incorporating lifting bosses for M24 lifting eyes and a designed splice between the upper and lower sections. The fin-wall assembly alone weighed just over 10 tonnes.

The engineering also considered far more than basic structural strength, including imposed and handrail loads, interaction with the surrounding building, deformation, stability, buckling and footfall vibration. Particular attention was given to how the staircase and supporting floor slab would behave together as construction progressed and additional loads were introduced.

Elsewhere, details were developed to maintain the architectural finish without compromising performance. The Food Hall stair, for example, incorporated European oak finishes and baluster connections with no visible fixings or baseplates, while internal balustrades were carefully coordinated to accommodate movement between the stair structures and the surrounding building.

Off-site Build

Off-site manufacture was an important part of the construction strategy at TQEC.

For our team, that meant taking complex architectural geometry and converting it into controlled workshop fabrication, with the opportunity to check fit, alignment, weld quality and finish before the assemblies reached Bristol.

That approach reduced the amount of work required within the building while giving greater control over quality, particularly important for steelwork that would ultimately remain highly visible.

A staircase that has become part of the building’s identity

The finished result now sits at the centre of a building designed around interaction and collaboration. Feilden Clegg Bradley Studios describe the main atrium feature as “a six-storey statement yellow staircase”.

The wider building includes active learning studios, advanced digital and prototyping facilities and a 300-seat in-the-round lecture theatre. It has also been designed to achieve BREEAM Excellent, connects to Bristol’s district heating network and has more than 750 solar panels on its roof.

For Taunton Fabrications, TQEC demonstrates our ability to deliver a turnkey package from detailed design development through to manufacture, finishing, logistical planning and installation. The project brought together complex structural and architectural steelwork alongside the wider secondary and access metalwork required throughout the building.

The yellow staircase may be the element everyone remembers, but it forms just one part of a much broader package and is a strong example of how we can take complex metalwork from concept and coordination through to a fully installed finished solution.

Images used © Taunton Fabrications & Creation Partnership / Video © Creation Partnership

Both SRM and the University of Bristol are delighted with the Project, and I would like to thank you and your team for your contribution on the Feature Staircase package.

Jim Fitzgerald, Sir Robert McAlpine Senior Commercial Manager 